10th of September 2010

River news


   
 
 



Forward the selected Calooshatchee Box News


Fill in this window if you want to email a single box.
Click HERE if you instead want to email more than one box.

Selected Box:

Pulse Flows to Estuary (2009-04-26)

On April 17 the Corps of Engineers halted water flow from S-79 (Franklin Lock) to the Caloosahatchee Estuary. They had resumed pulse flows in late March to maintain an average flow of 280 cfs at S-79 since Mar 1. [Summary] [Flow Status] [Lake O] [SCCF Salinity]

Email to*:

Copy to:

Your Name*:

Your E-Mail*:

Subject:

Message to be included with your email:

Note: All * are required fields.