The U.S. Army Corps of Engineers began began a 21-day pulse release of water from Lake Okeechobee to the Caloosahatchee Estuary on Mar 2. Water passes from Lake O through Moore Haven Lock, Ortona Lock and Franklin Lock to reach the estuary. [Details]